This is a Design / Build construction project @ the University of Mass Dartmouth Campus consisting of 2 phases. There are 14 two story wood frame apartment style dormitories, Cedar Dell Complex, built in 1986 that are scheduled to be renovated.
The first phase consists of renovating 7 of these building, Cedar Dell South, that must be ready for occupany by August 17, 2007. Approximately eight million dollars worth of work has to be completed in less than four months.
The scope of the renovations are the removal and replacement of all roof shingles, removal of existing windows and replace with new vinyl windows with security screens, remove all wood siding and trim and replace with prefinished Azek Trim and Hardiplank Siding, removal & replacement of rotted plywood sheathing and studs, a new sprinkler system, new boiler & hot water heaters, new tubs, new fintube radiation, upgrade the fire alarm system, new flooring and painting.
The second set of 7 buildings, Cedar Dell West, is scheduled to begin in the Fall of 07. Total Value of Project: $16 to $20 Million
No comments:
Post a Comment